Groundwater Recharge Projects

What is Groundwater Recharge?

Groundwater recharge is the process of replenishing groundwater aquifers with surface water from various sources such as storm water and rivers. This process is essential for maintaining a sustainable groundwater supply.

What is Conjunctive Use?

Conjunctive use is the integrated management of both surface water and groundwater resources to effectively deliver reliable water supply. While TID relies on surface water deliveries for our growers, the District will charge the groundwater aquifer when water is available and pump groundwater during times of drought – when surface water is in lower supply.

2024 Groundwater Recharge Projects

The TID Board of Directors has approved the implementation of certain Groundwater Recharge Projects when water is available. Idle Lands Groundwater Recharge has been approved for the 2024 Irrigation Season.

Idle lands that have existing connections to our canals are encouraged to flood irrigate to improve groundwater conditions. An example of an idle land would be an orchard that was removed for replanting in the future. Instead of letting the land sit unused, growers can irrigate free of charge.

Contact Us

Have questions or want to learn more about our groundwater recharge projects? Contact us at gwrecharge@tid.org or call us at 209.883.8356.

Additional Groundwater Projects

West Turlock Subbasin

West Turlock Subbasin Project Group #1

SourceRecharge Type
Tuolumne River Pre-Flood ReleasesOn-Farm Direct & In-Lieu
District Wide
Portion of District
Idle Lands
Dedicated Recharge
Micro Head Basins
City/County Storm Basins

West Turlock Subbasin Project Group #2

SourceRecharge Type
Local winter runoff water entering our canal system
from multiple locations
On-Farm Direct & In-Lieu
Portion of District
Idle Lands
Dedicated Recharge
Private Micro Head Basins
East Turlock Subbasin

East Turlock Subbasin Project Group #1

SourceRecharge Type
Tuolumne River Pre-Flood ReleasesOn-Farm Direct & In-Lieu
On Ag Lands
Dedicated Recharge
Dedicated Basins

East Turlock Subbasin Project Group #2

SourceRecharge Type
Local winter runoff water entering our canal system from multiple locationsOn-Farm Direct & In-Lieu
On Ag Lands
Dedicated Recharge
Dedicated Basins